« 返回

GM EDI Certification Instructions

Process by Business Unit (BU) / Division / System

  • LPN – License Plate Number
  • MGO – Material Global Optimization
  • CCA – Customer Care and Aftersales (formerly SPO (Service Parts Organization)

 

Before Getting Started

  • Certification Timeline Overview: GM allocates a total of 5 weeks for the full certification process. This timeline includes roughly one week for pursuit and EDI information gathering, three weeks dedicated to integration testing, and an additional week for production cutover.
  • Review the required messages in the table below.  Applicable messages for each BU are identified along with their corresponding EDI guidelines, which can be accessed through the embedded links within the table. These guidelines are also available in the Document Library on GM SupplyPower. All referenced materials are intended to support your preparation for internal EDI implementation testing. If you do not have access to GM SupplyPower, please review the GM SupplyPower Onboarding and Registration instructions.

 

Required Messages by BU

BU/Division/System  DELJIT DELFOR DESADV CONTRL RECADV APERAK
LPN Guidelines   Guidelines 

Guidelines 

Appendix  

Guidelines   Guidelines   Guidelines*  
MGO Guidelines Guidelines   Guidelines  Guidelines  Guidelines   
CCA   Guidelines  Guidelines  Guidelines    Guidelines 

 

 

 

 

 

Table Notes:

  • LPN APERAK is only transmitted by LPN-enabled plants*
  • LPN and MGO share common guidelines RECADV, DELJIT, and DELFOR. 
  • CONTRL message standard is shared among all divisions/BU/systems.

 

Certification Process

  • Download and Complete the GM Supplier EDI Information Form.
  • Initiate the Request for Certification Testing with Covisint. Submit an EDI Certification Request ticket by email to the Covisint EDI Certification Team and include the GM Supplier EDI Information form as an attachment. After your request is submitted, a certification agent will reach out with further instructions.
  • Conduct Pursuit and EDI Information Gathering. You will have one week to respond to / engage with the assigned certification agent and provide additional information as needed.
  • Complete Certification Integration Testing with Covisint. You will have three weeks to complete integrated testing with Covisint. 
    • Follow all certification testing steps as directed by your certification agent.
    • Send all test data to the appropriate GM BU/Division/System testing COMM Code listed in the table below.
    • Suppliers certifying against the LPN BU will receive an attestation document from the certification agent confirming successful testing, which must be signed and returned before the production cutover can be scheduled.
  • Cutover to Production. After completing certification testing, you will have one week to perform the production cutover. To ensure proper data exchange with the applicable GM production system.
    • Trading Partner Setup: You or your vendor must establish trading partner relationships between your three‑character COMM Code and the appropriate GM BU/Division/System production COMM Code(s) listed in the table below.
    • Data Transmission: Send all production data to the corresponding GM BU/Division/System production COMM Code(s) as outlined in the table below.

 

EDI Communication Codes (COMM Code) by BU and Environment

BU / Division / System  Test / Certification Comm Code Production Comm Code
LPN

GMGLBACPBCERT:ZZ and ZD1:ZZ 

GMGLBACPB:ZZ, BFT:ZZ, and MZ7:ZZ 
MGO ZD1:ZZ BFT:ZZ and MZ7:ZZ
CCA ZD1:ZZ PAF:ZZ